Tasks:

  • 3D surveying/BIM planning,
  • Prefabrication
  • Module system
  • Service and maintenance

Complete general building services engineering work with minimum loss of materials

We received an order for a complete general mechanical engineering construction work of a winery located in Villány. We started with a 3D survey and continued with BIM design. Before implementation, everything was scanned and drawn in BIM so that we could anticipate any problems that might arise during the design phase and have a real, accurate material inventory. In parallel with the design job, we were constantly scanning to track the changes and adapt the 3D plans accordingly, which we used to manufacture the system elements, such as the air handling system. With this procedure, only a single element in the aluminium ventilation system had to be modified on-site, which can be considered a ~0.2% error compared to the general loss of material of about 20% in ventilation projects.

More references

We use cookies

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.